In November 2023, our client, the Electricity Authority of Cyprus (EAC), experienced an overspeed incident on unit DE2 at their ICE1 power plant, at Dhekelia Power Station.
To determine the cause of the incident, BWSC conducted a thorough inspection of the engine and generator, which lead to the identification of the issue – The crankshaft had slipped causing the engine to be out of service for an extended period.
After successfully defining the scope of work and identifying the necessary spare parts in collaboration with EAC, BWSC was awarded the repair project in late 2024. With the project in place, the focus now shifts to repairing the engine, to ensure that the power plant returns to efficient operation and reaches its full capacity.
We are proud to support EAC in re-establishing their unit and ensuring the power plant’s long-term performance!
The repair project for EAC is expected to start in Q1, 2025 and the unit to be back online by late Q3 2025.